ITAC Assessment: IC0343
ITAC logo
ITAC Assessment: IC0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 135
Plant Area 145,100
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $369,925 4,014,701
kWh
Electricity Demand $76,548 7,224
kW-mo/yr
Electricity Fees $72,424 -
TOTAL YEARLY COSTS $518,897
RECOMMENDED SAVINGS* $104,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,753 $8,000 $8,753
95,146
kWh
-
02 2.7444: Close holes and openings in building such as broken windows $33 $25 $28
308
kWh
$4
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $573 $60 $360
3,915
kWh
$213
-
kW-mo/yr
04 2.2511: Insulate bare equipment $1,244 $1,900 $880
9,566
kWh
$364
-
kW-mo/yr
05 2.6212: Turn off equipment during breaks, reduce operating time $2,730 - $1,776
19,305
kWh
$954
-
kW-mo/yr
06 2.9114: Use solar heat to make electricty $89,645 $370,298 $55,176
599,742
kWh
$34,468
-
kW-mo/yr
07 2.7231: Use radiant heater for spot heating $700 $10,000 $700
7,605
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $316 $1,477 $224
2,430
kWh
$92
-
kW-mo/yr
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $554 $7,901 $577
6,266
kWh
$(-22.2)
-
kW-mo/yr
TOTAL RECOMMENDED $104,548 $399,661 $68,474
744,284
kWh
$36,074
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs