ITAC Assessment: AM0199
ITAC logo
ITAC Assessment: AM0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Aluminum extrusions, aluminum stadium seats, insulated glass
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 105,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,600 9,189,039
kWh
Natural Gas $326,515 111,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1135: Repair furnaces and oven doors so that they seal efficiently $16,380 $3,700 - $16,380
-
MMBtu
02 2.4314: Use synthetic lubricant $1,590 - $1,590
38,980
kWh
-
03 2.4133: Use most efficient type of electric motors $1,190 $1,874 $1,190
29,308
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,410 $70 $3,410
84,994
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $2,055 $1,570
73,271
kWh
-
06 2.4314: Use synthetic lubricant $670 - $670
12,603
kWh
-
07 2.4133: Use most efficient type of electric motors $470 $730 $470
8,792
kWh
-
TOTAL RECOMMENDED $25,280 $8,429 $8,900
247,948
kWh
$16,380
-
MMBtu
TOTAL IMPLEMENTED $22,550 $7,699 $6,170
187,573
kWh
$16,380
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs