Assessment Year | 2018 |
---|---|
Principal Product | steel pressure tanks |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 348 |
Plant Area |
275,000
ft2
|
Annual Production | 225,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $537,294 | 9,173,126 |
kWh
|
$0.059 | |
Electricity Demand | $117,049 | 29,849 |
kW-mo/yr
|
$3.92 | |
Natural Gas | $232,271 | 92,663 |
MMBtu
|
$2.51 | |
Waste Disposal Costs | |||||
Water Usage | $14,921 | 2,470,818 |
Tgal
|
$0.006 | |
TOTAL YEARLY COSTS | $901,535 | ||||
RECOMMENDED SAVINGS* | $40,897 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $9,906 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $8,331 | $1,160 |
$6,284
106,517
kWh
|
$2,047
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,876 | - |
$4,929
83,542
kWh
|
$947
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,589 | - |
$5,529
93,711
kWh
|
$1,060
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $799 | $10,685 |
$671
11,356
kWh
|
$128
-
kW-mo/yr
|
- | - | |
05 | 2.4227: Use compressor air filters | $3,317 | $7,200 |
$3,317
56,225
kWh
|
- | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $5,110 | $3,000 | - | - |
$5,110
-
MMBtu
|
- | |
07 | 2.3212: Optimize plant power factor | $4,834 | $26,380 | - | - | - | $4,834 | |
08 | 2.9112: Use solar heat to heat water | $6,041 | $66,682 |
$6,041
100,684
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $40,897 | $115,107 |
$26,771
452,035
kWh
|
$4,182
-
kW-mo/yr
|
$5,110
-
MMBtu
|
$4,834 | ||
TOTAL IMPLEMENTED | $9,906 | $7,200 |
$8,846
149,936
kWh
|
$1,060
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs