| Assessment Year | 1983 |
|---|---|
| Principal Product | ICE CREAM AND MILK |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 131,000
Tgal
|
| Production Hrs. Annual | 5,775
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $155,094 | 4,140,094 |
kWh
|
$0.037 |
| Natural Gas | $108,065 | 35,746 |
MMBtu
|
$3.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $85,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $59,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $433 | $759 | - |
$433
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $5,050 | $8,000 | - |
$5,050
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $1,010 | $423 | - |
$1,010
-
MMBtu
|
|
| 04 | 2.7226: Use computer programs to optimize hvac performance | $2,821 | $3,032 |
$2,821
82,943
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,161 | $695 | - |
$5,161
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,873 | $4,897 |
$1,873
48,359
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $643 | $1,765 |
$643
17,292
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $333 | $1,117 |
$333
11,137
kWh
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $2,659 | $490 |
$2,659
75,029
kWh
|
- | |
| 10 | 2.4133: Use most efficient type of electric motors | $4,063 | $270 | - |
$4,063
-
MMBtu
|
|
| 11 | 2.2447: Heat water with exhaust heat | $54,540 | $36,000 | - |
$54,540
-
MMBtu
|
|
| 12 | 2.8114: Change rate schedules or other changes in utility service | $6,511 | $27,000 |
$6,511
-
kWh
|
- | |
| 13 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $471 | $477 | - |
$471
-
MMBtu
|
|
| 14 | 2.2122: Install / repair insulation on condensate lines | $79 | $136 | - |
$79
-
MMBtu
|
|
| TOTAL RECOMMENDED | $85,647 | $85,061 |
$14,840
234,760
kWh
|
$70,807
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $59,590 | $44,000 | - |
$59,590
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs