Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,595

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0602 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $829 $483
SU0602 #06 Y:2026 Install spectral reflectors / delamp $400 $200
SU0602 #05 Y:2026 Install compressor air intakes in coolest locations $2,039 $943
SU0602 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $35,297 $15,700
SU0602 #03 Y:2026 Change rate schedules or other changes in utility service $32,852 -
SU0602 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $4,223 -
SU0602 #01 Y:2026 Eliminate/reduce an operation $2,057 -
SJ0052 #06 Y:2026 Eliminate or reduce compressed air usage $680 -
SJ0052 #05 Y:2026 Install equipment (eg compactor) to reduce disposal costs $21,424 $57,800
SJ0052 #04 Y:2026 Use solar heat to make electricty $156,271 $1,409,408
SJ0052 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,482 -
SJ0052 #02 Y:2026 Eliminate or reduce compressed air usage $1,611 -
SJ0052 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $54,001 $194,483
SF0652 #07 Y:2026 Replace city water with recycled water via cooling tower $111,329 $388,045
SF0652 #06 Y:2026 Use photocell controls $2,716 $12,669
SF0652 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,632 $21,317
SF0652 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $313 $462
SF0652 #03 Y:2026 Recharge batteries on during off-peak demand periods $4,938 $5,263
SF0652 #02 Y:2026 Reduce space conditioning during non-working hours $5,780 $4,983
SF0652 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $21,138 $7,872