Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,864

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0611 #10 Y:2026 Clean or color roof to reduce solar load $7,221 $34,509
LE0611 #09 Y:2026 Replace existing hvac unit with high efficiency model $21,077 $86,163
LE0611 #08 Y:2026 Use compressor air filters $21,640 $40,000
LE0611 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $24,193 $16,755
LE0611 #06 Y:2026 Install compressor air intakes in coolest locations $6,159 $4,000
LE0611 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $38,387 $21,560
LE0611 #04 Y:2026 Install occupancy sensors $924 $350
LE0611 #03 Y:2026 Install occupancy sensors $6,024 $2,100
LE0611 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $13,022 $2,360
LE0611 #01 Y:2026 Install timers and/or thermostats $5,549 -
UL2601 #07 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,800 -
UL2601 #06 Y:2026 Minimize operation of equipment maintained in standby condition $2,209 -
UL2601 #05 Y:2026 Install occupancy sensors $901 $1,397
UL2601 #04 Y:2026 Reduce illumination to minimum necessary levels $1,551 -
UL2601 #03 Y:2026 Use solar heat to make electricty $35,670 $476,148
UL2601 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,308 $945
UL2601 #01 Y:2026 Optimize plant power factor $5,606 $8,923
OR0824 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,882 $2,736
OR0824 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,992 $3,020
OR0824 #01 Y:2026 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,084 $500