Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,200

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0330 #07 Y:2024 Use closed cycle process to minimize waste water production $6,469 $25,000
TT0330 #06 Y:2024 Recover heat from exhausted steam, hot air or hot water $10,702 $50,000
TT0330 #05 Y:2024 Preheat boiler makeup water with waste process heat $11,614 $38,380
TT0330 #04 Y:2024 Turn off equipment when not in use $19,725 $12,000
TT0330 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $25,346 $1,500
TT0330 #02 Y:2024 Install occupancy sensors $30,472 $17,136
TT0330 #01 Y:2024 Use solar heat to make electricty $508,143 $2,436,747
IC0323 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $130 $288
IC0323 #06 Y:2024 Replace boiler $5,000 $39,055
IC0323 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $497 $1,045
IC0323 #04 Y:2024 Install occupancy sensors $6,567 $6,783
IC0323 #03 Y:2024 Insulate bare equipment $984 $6,680
IC0323 #02 Y:2024 Use demand controller or load shedder $549 $2,512
IC0323 #01 Y:2024 Use solar heat to make electricty $47,182 $233,599
UD1106 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $11,902 $8,000
UD1106 #02 Y:2024 Use proper thickness of insulation on building envelope $411 $1,920
UD1106 #01 Y:2024 Lower temperature during the winter season and vice-versa $14,990 -
IC0322 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $205 $144
IC0322 #10 Y:2024 Eliminate or reduce compressed air usage $1,536 $2,000
IC0322 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,919 -