ITAC Assessment: NL0115
ITAC logo
ITAC Assessment: NL0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $50
M
to 100
M
# of Employees 78
Plant Area 370,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,125
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,943 3,416,832
kWh
Electricity Demand $149,647 8,303
kW-mo/yr
Electricity Fees $9,970 -
Natural Gas $211,234 38,374
MMBtu
Waste Disposal Costs
Water Usage $16,127 2,038
Tgal
Water Disposal $101 4
Tgal
Other Liquid (non-haz) $3,785 1
gal
TOTAL YEARLY COSTS $504,807
RECOMMENDED SAVINGS* $18,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $6,522 $14,152 $1,136
33,418
kWh
- - - $5,386 -
02 2.8121: Apply for tax-free status for energy purchases $6,308 $4,304 - - $5,251 $1,057
-
gal
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,976 $3,500 $3,684
108,360
kWh
- - - $(-608.0) $(-100.0)
04 2.4226: Use / purchase optimum sized compressor $2,339 $3,448 $2,339
68,789
kWh
- - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $341 $278 $121
3,560
kWh
$220
-
kW-mo/yr
- - - -
06 2.4322: Use or replace with energy efficient substitutes $111 $254 $111
3,252
kWh
- - - - -
TOTAL RECOMMENDED $18,597 $25,936 $7,391
217,379
kWh
$220
-
kW-mo/yr
$5,251 $1,057
-
gal
$4,778 $(-100.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs