ITAC Assessment: UK1708
ITAC logo
ITAC Assessment: UK1708
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 5
Plant Area 65,000
ft2
Annual Production 596,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,139 1,851,480
kWh
Electricity Demand $35,629 3,733
kW-mo/yr
Electricity Fees $4,217 -
TOTAL YEARLY COSTS $148,985
RECOMMENDED SAVINGS* $94,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,813 $31,719 $41,089
696,420
kWh
$5,724
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $5,465 $26,520 $3,198
54,203
kWh
$2,267
-
kW-mo/yr
- -
03 2.4321: Upgrade obsolete equipment $2,904 - $2,904
49,220
kWh
- - -
04 2.7111: Reduce illumination to minimum necessary levels $14,895 - $6,822
115,632
kWh
$754
-
kW-mo/yr
$7,319 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $986 $1,253 $862
14,606
kWh
$124
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $461 $762 $289
4,894
kWh
$172
-
kW-mo/yr
- -
07 2.7124: Make a practice of turning off lights when not needed $217 - $217
3,686
kWh
- - -
08 2.4156: Establish a preventative maintenance program $333 - - - - $333
09 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $22,096 $78,750 $18,089
306,600
kWh
$4,007
-
kW-mo/yr
- -
TOTAL RECOMMENDED $94,170 $139,004 $73,470
1,245,261
kWh
$13,048
-
kW-mo/yr
$7,319 $333
TOTAL IMPLEMENTED $217 - $217
3,686
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs