ITAC Assessment: NC0183
ITAC logo
ITAC Assessment: NC0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Gasoline pumps
NAICS
n/a
SIC 3586: Measuring and Dispensing Pumps
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 165,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,623 1,213,072
kWh
Electricity Demand $31,991 3,906
kW-mo/yr
Natural Gas $12,586 2,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $7,429 $2,731 $3,069
56,272
kWh
$2,760
-
kW-mo/yr
- - - - - $1,600
02 2.7241: Install outside air damper / economizer on hvac unit $6,611 $11,000 $6,611
121,043
kWh
- - - - - - -
03 2.7245: Use direct air supply to exhaust hoods $3,631 $7,500 $1,342
24,619
kWh
$2,289
-
kW-mo/yr
- - - - - -
04 2.7221: Lower temperature during the winter season and vice-versa $5,091 $3,300 $2,170
39,859
kWh
- $2,921
-
MMBtu
- - - - -
05 2.7111: Reduce illumination to minimum necessary levels $884 $600 $465
8,499
kWh
$419
-
kW-mo/yr
- - - - - -
06 2.4322: Use or replace with energy efficient substitutes $4,983 $10,750 $2,565
46,893
kWh
$2,418
-
kW-mo/yr
- - - - - -
07 3.3125: Use distillation, evaporation to remove contaminants $13,598 $12,000 $(-524.0)
(-9,672)
kWh
- - $(-878.0)
-
Tgal
$6,240
-
gal
- $8,760 -
08 3.4114: Replace city water with recycled water via cooling tower $6,838 $3,700 $(-63.0)
(-1,172)
kWh
$(-102.0)
-
kW-mo/yr
- $7,003
-
Tgal
- - - -
09 3.5313: Increase amount of waste recovered for resale $500 $500 - - - - - $500
-
lb
- -
10 4.311: Schedule deliveries according to demand $20,448 $5,000 $1,698
31,067
kWh
- - - - - $18,750 -
TOTAL RECOMMENDED $70,013 $57,081 $17,333
317,408
kWh
$7,784
-
kW-mo/yr
$2,921
-
MMBtu
$6,125
-
Tgal
$6,240
-
gal
$500
-
lb
$27,510 $1,600
TOTAL IMPLEMENTED $47,301 $26,331 $13,950
255,568
kWh
$3,077
-
kW-mo/yr
$2,921
-
MMBtu
$7,003
-
Tgal
- - $18,750 $1,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs