Assessment Year | 2000 |
---|---|
Principal Product | Gasoline pumps |
NAICS |
n/a
|
SIC | 3586: Measuring and Dispensing Pumps |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
165,000
ft2
|
Annual Production | 16,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,623 | 1,213,072 |
kWh
|
$0.055 |
Electricity Demand | $31,991 | 3,906 |
kW-mo/yr
|
$8.19 |
Natural Gas | $12,586 | 2,206 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,301 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $7,429 | $2,731 |
$3,069
56,272
kWh
|
$2,760
-
kW-mo/yr
|
- | - | - | - | - | $1,600 | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $6,611 | $11,000 |
$6,611
121,043
kWh
|
- | - | - | - | - | - | - | |
03 | 2.7245: Use direct air supply to exhaust hoods | $3,631 | $7,500 |
$1,342
24,619
kWh
|
$2,289
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $5,091 | $3,300 |
$2,170
39,859
kWh
|
- |
$2,921
-
MMBtu
|
- | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $884 | $600 |
$465
8,499
kWh
|
$419
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $4,983 | $10,750 |
$2,565
46,893
kWh
|
$2,418
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 3.3125: Use distillation, evaporation to remove contaminants | $13,598 | $12,000 |
$(-524.0)
(-9,672)
kWh
|
- | - |
$(-878.0)
-
Tgal
|
$6,240
-
gal
|
- | $8,760 | - | |
08 | 3.4114: Replace city water with recycled water via cooling tower | $6,838 | $3,700 |
$(-63.0)
(-1,172)
kWh
|
$(-102.0)
-
kW-mo/yr
|
- |
$7,003
-
Tgal
|
- | - | - | - | |
09 | 3.5313: Increase amount of waste recovered for resale | $500 | $500 | - | - | - | - | - |
$500
-
lb
|
- | - | |
10 | 4.311: Schedule deliveries according to demand | $20,448 | $5,000 |
$1,698
31,067
kWh
|
- | - | - | - | - | $18,750 | - | |
TOTAL RECOMMENDED | $70,013 | $57,081 |
$17,333
317,408
kWh
|
$7,784
-
kW-mo/yr
|
$2,921
-
MMBtu
|
$6,125
-
Tgal
|
$6,240
-
gal
|
$500
-
lb
|
$27,510 | $1,600 | ||
TOTAL IMPLEMENTED | $47,301 | $26,331 |
$13,950
255,568
kWh
|
$3,077
-
kW-mo/yr
|
$2,921
-
MMBtu
|
$7,003
-
Tgal
|
- | - | $18,750 | $1,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs