ITAC Assessment: SU0575
ITAC logo
ITAC Assessment: SU0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Custom Springs and Wire Forms
NAICS 332613: Spring Manufacturing
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 128,000
ft2
Annual Production 79,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,020 2,602,176
kWh
Electricity Demand $92,617 7,757
kW-mo/yr
Electricity Fees $16,242 -
Natural Gas $10,129 3,547
MMBtu
Other Gas $926 3,547
MMBtu
Waste Disposal Costs
Water Usage $932 178
Tgal
Water Disposal $265 178
Tgal
TOTAL YEARLY COSTS $288,130
RECOMMENDED SAVINGS* $32,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,632 - - $4,632
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $3,156 - $3,156
49,316
kWh
- - -
03 2.8121: Apply for tax-free status for energy purchases $4,602 $49 - - - $4,602
04 2.4322: Use or replace with energy efficient substitutes $1,093 $37 $576
9,000
kWh
$627
-
kW-mo/yr
$(-109.6)
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,017 $90 $1,017
15,918
kWh
- - -
06 2.7224: Reduce space conditioning during non-working hours $769 $393 - - $769
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $3,242 $4,739 - - $3,242
-
MMBtu
-
08 2.6211: Conserve energy by efficient use of vending machines $98 $186 $98
1,533
kWh
- - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $144 $621 - - $144
-
MMBtu
-
10 2.9114: Use solar heat to make electricty $13,875 $178,227 $13,875
216,800
kWh
- - -
TOTAL RECOMMENDED $32,627 $184,342 $18,722
292,567
kWh
$5,259
-
kW-mo/yr
$4,045
-
MMBtu
$4,602
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs