ITAC Assessment: SF0639
ITAC logo
ITAC Assessment: SF0639
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Salt for Industrial Applications
NAICS 212393: Other Chemical and Fertilizer Mineral Mining
SIC 1479: Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 40,000
ft2
Annual Production 250,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,325 25,731
kWh
Electricity Fees $659 -
LPG $28,912 1,042
MMBtu
Fuel Oil #2 $29,956 1,291
MMBtu
TOTAL YEARLY COSTS $61,852
RECOMMENDED SAVINGS* $12,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status LPG Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $513 - $513
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $203 $84 $203
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $1,361 $881 $1,361
-
MMBtu
-
04 2.1116: Improve combustion control capability $2,659 $1,709 $475
-
MMBtu
$2,184
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $5,868 $4,042 $5,868
-
MMBtu
-
06 2.1112: Heat oil to proper temperature for good atomization $1,965 $4,368 $1,965
-
MMBtu
-
TOTAL RECOMMENDED $12,569 $11,084 $10,385
-
MMBtu
$2,184
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs