Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,458

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0087 #02 Y:2026 Install occupancy sensors $5,702 $1,176
MU0087 #01 Y:2026 Install timers and/or thermostats $47,502 $85
IC0345 #11 Y:2026 Install / repair insulation on steam lines $11,178 $2,752
IC0345 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,563 $1,775
IC0345 #09 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $6,608 $10,990
IC0345 #08 Y:2026 Eliminate or reduce compressed air usage $709 $2,496
IC0345 #07 Y:2026 Use demand controller or load shedder $819 $1,912
IC0345 #06 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $6,218 $10,544
IC0345 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,677 $720
IC0345 #04 Y:2026 Turn off equipment when not in use $18,089 $6,484
IC0345 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $6,117 $5,000
IC0345 #02 Y:2026 Recover waste heat from equipment $1,362 $2,900
IC0345 #01 Y:2026 Eliminate or reduce compressed air usage $4,722 $1,338
GT1005 #09 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $1,558 $5,400
GT1005 #08 Y:2026 Turn off equipment during breaks, reduce operating time $201 $260
GT1005 #07 Y:2026 Eliminate or reduce compressed air usage $2,644 $1,500
GT1005 #06 Y:2026 Conserve energy by efficient use of vending machines $86 $45
GT1005 #05 Y:2026 Reduce space conditioning during non-working hours $2,779 $750
GT1005 #04 Y:2026 Install timers on light switches in little used areas $6,314 $1,658
GT1005 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,904 $1,850