Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,690

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0279 #04 Y:2025 Reduce hot water temperature to the minimum required $8,900 $4,720
UU0279 #03 Y:2025 Repair and eliminate steam leaks $5,400 $15,580
UU0279 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $119,920 $620,000
UU0279 #01 Y:2025 Purchase gas directly from a contract gas supplier $92,200 $14,000
TT0339 #09 Y:2025 Reduce space conditioning during non-working hours $868 $100
TT0339 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $6,566 $850
TT0339 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $11,575 $11,250
TT0339 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $15,876 $5,625
TT0339 #05 Y:2025 Turn off equipment during breaks, reduce operating time $22,030 $20,000
TT0339 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $24,795 $10,920
TT0339 #03 Y:2025 Optimize plant power factor $31,076 $9,750
TT0339 #02 Y:2025 Begin a practice of predictive / preventative maintenance $33,333 $35,000
TT0339 #01 Y:2025 Use solar heat for heat $49,796 $276,634
OK1150 #06 Y:2025 Conserve energy by efficient use of vending machines $508 $570
OK1150 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,376 $5,473
OK1150 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $670 -
OK1150 #03 Y:2025 Install timers and/or thermostats $2,139 $3,510
OK1150 #02 Y:2025 Use solar heat to make electricty $21,879 $215,280
OK1150 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,079 $4,144
NT0050 #05 Y:2025 Use properly designed and sized hvac equipment $2,692 $7,518