Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,579

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM40 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,511 $1,067
MUCM40 #01 Y:2026 Install vinyl strip / high speed / air curtain doors $134,609 $14,256
LT8449 #04 Y:2026 Use solar heat to make electricty $3,122 $51,744
LT8449 #03 Y:2026 Install timers and/or thermostats $8,790 $1,056
LT8449 #02 Y:2026 Install occupancy sensors $884 $1,364
LT8449 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $204 $169
UL2610 #09 Y:2026 Use solar heat to make electricty $11,783 $116,051
UL2610 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,565 $11,013
UL2610 #07 Y:2026 Install occupancy sensors $102 $386
UL2610 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,253 $315
UL2610 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,804 $19,530
UL2610 #04 Y:2026 Optimize plant power factor $5,290 $27,000
UL2610 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,056 -
UL2610 #02 Y:2026 Insulate bare equipment $2,011 $1,050
UL2610 #01 Y:2026 Re-size charging openings or add a movable door on equipment $286 $200
SU0605 #08 Y:2026 Install vinyl strip / high speed / air curtain doors $1,230 $4,746
SU0605 #07 Y:2026 Conserve energy by efficient use of vending machines $104 $187
SU0605 #06 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $801 $1,268
SU0605 #05 Y:2026 Install / repair insulation on steam lines $266 $408
SU0605 #04 Y:2026 Use or replace with energy efficient substitutes $404 $303