| Assessment Year | 2026 |
|---|---|
| Principal Product | 0 |
| NAICS | 721110: Hotels (except Casino Hotels) and Motels |
| SIC | 7011: Hotels and Motels |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,253 | 3,504,185 |
kWh
|
$0.044 |
| Electricity Demand | $224,869 | 6,746 |
kW-mo/yr
|
$33.33 |
| Electricity Fees | $61,020 | - |
|
- |
| Natural Gas | $234,877 | 18,485 |
MMBtu
|
$12.71 |
| Other Gas | $18,487 | 1 |
MMBtu
|
$18,487.00 |
| TOTAL YEARLY COSTS | $692,506 | |||
| RECOMMENDED SAVINGS* | $148,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $135,226 | $14,301 |
$14,001
304,182
kWh
|
$12,614
-
kW-mo/yr
|
$108,611
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,511 | $1,067 |
$2,557
58,119
kWh
|
$2,953
-
kW-mo/yr
|
- | |
| 03 | 2.2223: Enhance sensitivity of temperature control and cutoff | $4,460 | $2,904 | - | - |
$4,460
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $630 | $1,005 |
$309
7,021
kWh
|
$321
-
kW-mo/yr
|
- | |
| 05 | 2.7134: Use photocell controls | $896 | $581 |
$396
9,004
kWh
|
$500
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $626 | $446 |
$307
6,980
kWh
|
$319
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $870 | $4,029 |
$426
9,689
kWh
|
$443
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $148,218 | $24,333 |
$17,997
394,994
kWh
|
$17,150
-
kW-mo/yr
|
$113,071
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs