Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,607

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0687 #06 Y:2026 Use battery storage for demand control $6,128 $249
SD0687 #05 Y:2026 Use solar heat to make electricty $168,511 $172,626
SD0687 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $87 $169
SD0687 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $902 -
SD0687 #02 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $567 $1,200
SD0687 #01 Y:2026 Replace existing chiller with high efficiency model $3,112 $3,000
AS0614 #09 Y:2026 Install occupancy sensors $74 $53
AS0614 #08 Y:2026 Install spectral reflectors / delamp $107 $18
AS0614 #07 Y:2026 Replace broken windows and/or window sash $654 $105
AS0614 #06 Y:2026 Insulate bare equipment $755 $3,123
AS0614 #05 Y:2026 Conserve energy by efficient use of vending machines $1,404 $1,245
AS0614 #04 Y:2026 Make a practice of turning off lights when not needed $2,428 $405
AS0614 #03 Y:2026 Eliminate or reduce compressed air usage $2,900 $140
AS0614 #02 Y:2026 Install timers on light switches in little used areas $7,253 $6,917
AS0614 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,757 $13,649
AM0977 #04 Y:2026 Use solar heat to make electricty $9,662 $112,320
AM0977 #03 Y:2026 Make a practice of turning off lights when not needed $723 $100
AM0977 #02 Y:2026 Install occupancy sensors $1,004 $4,056
AM0977 #01 Y:2026 Chill water to the highest temperature possible $4,506 $1,000
WM0261 #04 Y:2026 Eliminate or reduce compressed air usage $1,552 $1,075