ITAC Assessment: AS0614
ITAC logo
ITAC Assessment: AS0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product aerospace electronics
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 186,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $880,475 12,501,100
kWh
Electricity Demand $645,628 31,335
kW-mo/yr
Electricity Fees $82,073 -
TOTAL YEARLY COSTS $1,608,176
RECOMMENDED SAVINGS* $24,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,757 $13,649 $4,971
70,616
kWh
$3,786
-
kW-mo/yr
-
02 2.7132: Install timers on light switches in little used areas $7,253 $6,917 $3,699
52,536
kWh
$3,554
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $2,900 $140 $2,070
29,407
kWh
$830
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $2,428 $405 $1,237
17,578
kWh
$1,191
-
kW-mo/yr
-
05 2.6211: Conserve energy by efficient use of vending machines $1,404 $1,245 $1,002
14,235
kWh
$402
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $755 $3,123 $755
10,724
kWh
- -
07 2.7441: Replace broken windows and/or window sash $654 $105 $364
5,169
kWh
$290
-
kW-mo/yr
-
08 2.7144: Install spectral reflectors / delamp $107 $18 $59
841
kWh
$25
-
kW-mo/yr
$23
09 2.7135: Install occupancy sensors $74 $53 $53
757
kWh
$21
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,332 $25,655 $14,210
201,863
kWh
$10,099
-
kW-mo/yr
$23
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs