Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PARTICLE BOARD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 223
Plant Area
n/a
Annual Production 91,300
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,343,107 31,584,995
kWh
LPG $19,698 5,523
MMBtu
Fuel Oil #6 $55,662 17,252
MMBtu
Wood $95,621 195,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $4,686 $4,515 $4,686
110,199
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,129 $28,775 $11,129
261,723
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,651 - $11,651
274,033
kWh
04 2.4312: Improve lubrication practices $2,986 - $2,986
70,340
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $50 $1,310
30,774
kWh
TOTAL RECOMMENDED $31,762 $33,340 $31,762
747,069
kWh
TOTAL IMPLEMENTED $5,996 $4,565 $5,996
140,973
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs