ITAC Assessment: SD0687
ITAC logo
ITAC Assessment: SD0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Machined Parts
NAICS 332710: Machine Shops
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 20,000
ft2
Annual Production 8,000
units
Production Hrs. Annual 3,213
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,713 439,774
kWh
Electricity Demand $73,186 1,098
kW-mo/yr
Electricity Fees $9,757 -
TOTAL YEARLY COSTS $156,656
RECOMMENDED SAVINGS* $179,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2622: Replace existing chiller with high efficiency model $3,112 $3,000 $1,252
7,470
kWh
$1,860
-
kW-mo/yr
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $576 $1,200 $576
3,383
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $965 - $965
5,756
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $87 $169 $53
316
kWh
$34
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $168,511 $172,626 $63,349
377,980
kWh
$105,162
-
kW-mo/yr
06 2.3141: Use battery storage for demand control $6,128 $249 $(-326.0)
(-1,950)
kWh
$6,454
-
kW-mo/yr
TOTAL RECOMMENDED $179,379 $177,244 $65,869
392,955
kWh
$113,510
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs