ITAC Assessment: OR0039
ITAC logo
ITAC Assessment: OR0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DIMENSIONAL LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 76,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,450 6,935,522
kWh
Wood $222,254 520,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,384 $5,000 $13,384
286,049
kWh
- -
02 2.4133: Use most efficient type of electric motors $498 $630 $498
10,551
kWh
- -
03 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $73,000 $100,000 $353,000
6,935,522
kWh
$(-133,000.0)
-
MMBtu
$(-147,000.0)
04 2.3212: Optimize plant power factor $6,379 $13,650 $6,379
-
kWh
- -
05 2.2532: Use only amount of air necessary to prevent explosion hazard $15,101 $32,576 $15,101
442,849
kWh
- -
TOTAL RECOMMENDED $108,362 $151,856 $388,362
7,674,971
kWh
$(-133,000.0)
-
MMBtu
$(-147,000.0)
TOTAL IMPLEMENTED $35,362 $51,856 $35,362
739,449
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs