Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,682

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1141 #07 Y:2026 Optimize plant power factor $78,726 $82,652
UD1141 #06 Y:2026 Eliminate or reduce compressed air usage $7,415 $16,650
UD1141 #05 Y:2026 Install compressor air intakes in coolest locations $34,953 $6,400
UD1141 #04 Y:2026 Install motor voltage controller on lightly loaded motors $4,932 $4,034
UD1141 #03 Y:2026 Minimize operation of equipment maintained in standby condition $5,189 -
UD1141 #02 Y:2026 Install outside air damper / economizer on hvac unit $22,433 $696
UD1141 #01 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $66,211 $13,947
SJ0053 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,255 $441
SJ0053 #04 Y:2026 Use solar heat to make electricty $31,594 $87,583
SJ0053 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,612 -
SJ0053 #02 Y:2026 Use or replace with energy efficient substitutes $7,393 $34,858
SJ0053 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $12,034 $26,453
OR0832 #04 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $31,560 $243,649
OR0832 #03 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $23,710 $48,334
OR0832 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,071 $10,190
OR0832 #01 Y:2026 Eliminate/reduce an operation $32,217 $26,036
OK1173 #04 Y:2026 Use or replace with energy efficient substitutes $4,108 $19,620
OK1173 #03 Y:2026 Utilize controls to operate equipment only when needed $6,922 $99,000
OK1173 #02 Y:2026 Install occupancy sensors $317 $1,221
OK1173 #01 Y:2026 Use solar heat to make electricty $11,680 $110,167