ITAC Assessment: SJ0053
ITAC logo
ITAC Assessment: SJ0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed lumber, pallets, wood bins
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 220,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,540 164,071
kWh
Electricity Demand $22,768 998
kW-mo/yr
Electricity Fees $300 -
TOTAL YEARLY COSTS $108,608
RECOMMENDED SAVINGS* $54,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,034 $26,453 $10,553
20,255
kWh
$1,481
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $7,393 $34,858 $6,564
12,599
kWh
$829
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,612 - $2,612
5,013
kWh
-
04 2.9114: Use solar heat to make electricty $31,594 $87,583 $30,852
59,218
kWh
$742
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,255 $441 $989
1,898
kWh
$266
-
kW-mo/yr
TOTAL RECOMMENDED $54,888 $149,335 $51,570
98,983
kWh
$3,318
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs