170,595
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0649 #10 Y:2026 | 10 | 2026 | Use waste heat from hot flue gases to preheat incoming fluids | $6,422 | $29,062 |
n/a
|
| SF0649 #09 Y:2026 | 09 | 2026 | Make a practice of turning off lights when not needed | $788 | $2,785 |
n/a
|
| SF0649 #08 Y:2026 | 08 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $16,383 | $49,958 |
n/a
|
| SF0649 #07 Y:2026 | 07 | 2026 | Utilize controls to operate equipment only when needed | $1,544 | $4,130 |
n/a
|
| SF0649 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $38,998 | $38,922 |
n/a
|
| SF0649 #05 Y:2026 | 05 | 2026 | Reduce space conditioning during non-working hours | $5,987 | $5,606 |
n/a
|
| SF0649 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $11,258 | $6,264 |
n/a
|
| SF0649 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,578 | - |
n/a
|
| SF0649 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $3,116 | $220 |
n/a
|
| SF0649 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,092 | - |
n/a
|
| MS0468 #06 Y:2026 | 06 | 2026 | Replace dc equipment with ac equipment | $2,100 | $26,537 |
n/a
|
| MS0468 #05 Y:2026 | 05 | 2026 | Install timers and/or thermostats | $34,362 | $147,620 |
n/a
|
| MS0468 #04 Y:2026 | 04 | 2026 | Purchase equipment instead of leasing | $607,068 | $889,000 |
n/a
|
| MS0468 #03 Y:2026 | 03 | 2026 | Lower temperature during the winter season and vice-versa | $24,902 | - |
n/a
|
| MS0468 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $13,520 | - |
n/a
|
| MS0468 #01 Y:2026 | 01 | 2026 | Improve air circulation with destratification fans / other methods | $29,766 | $61,672 |
n/a
|
| GT1006 #09 Y:2026 | 09 | 2026 | Use solar heat to make electricty | $463,700 | $3,319,567 |
n/a
|
| GT1006 #08 Y:2026 | 08 | 2026 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $41,860 | $258,750 |
n/a
|
| GT1006 #07 Y:2026 | 07 | 2026 | Improve air circulation with destratification fans / other methods | $4,198 | $22,400 |
n/a
|
| GT1006 #06 Y:2026 | 06 | 2026 | Turn off equipment during breaks, reduce operating time | $396 | $1,950 |
n/a
|