ITAC Assessment: MS0468
ITAC logo
ITAC Assessment: MS0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Paper Clips
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 925,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 3,750
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,959 7,821,600
kWh
Electricity Demand $304,972 21,364
kW-mo/yr
Electricity Fees $39,510 -
Natural Gas $136,960 15,852
MMBtu
LPG $38,400 1,873
MMBtu
Waste Disposal Costs
Water Usage $14,632 1,427
Tgal
Water Disposal $11,489 1,427
Tgal
TOTAL YEARLY COSTS $1,101,922
RECOMMENDED SAVINGS* $711,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $29,766 $61,672 $29,766
418,647
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,520 - $13,520
190,154
kWh
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $24,902 - - $24,902
-
MMBtu
- -
04 4.231: Purchase equipment instead of leasing $607,068 $889,000 $(-15,307.0)
(-215,294)
kWh
- $38,400
-
MMBtu
$583,975
05 2.7261: Install timers and/or thermostats $34,362 $147,620 $34,362
483,288
kWh
- - -
06 2.3311: Replace dc equipment with ac equipment $2,100 $26,537 $2,100
29,540
kWh
- - -
TOTAL RECOMMENDED $711,718 $1,124,829 $64,441
906,335
kWh
$24,902
-
MMBtu
$38,400
-
MMBtu
$583,975
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs