Assessment Year | 2022 |
---|---|
Principal Product | Carbonated beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
35,000
ft2
|
Annual Production | 66,013
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $629,330 | 11,844,005 |
kWh
|
$0.053 | |
Electricity Demand | $54,339 | 29,482 |
kW-mo/yr
|
$1.84 | |
Electricity Fees | $1,494 | - |
|
- | |
Natural Gas | $272,495 | 39,391 |
MMBtu
|
$6.92 | |
Waste Disposal Costs | |||||
Water Usage | $903,245 | 140,210 |
Tgal
|
$6.44 | |
TOTAL YEARLY COSTS | $1,860,903 | ||||
RECOMMENDED SAVINGS* | $218,199 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $88,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.7221: Improve process control to prevent spills of material | $4,080 | $450 | - | - |
$2,470
-
MMBtu
|
$1,610
-
Tgal
|
|
02 | 2.2136: Install / repair insulation on steam lines | $644 | $233 | - | - |
$644
-
MMBtu
|
- | |
03 | 2.6218: Turn off equipment when not in use | $17,800 | $600 |
$16,261
306,800
kWh
|
$1,539
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $62,500 | $120,300 |
$57,134
1,078,000
kWh
|
$5,366
-
kW-mo/yr
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $14,276 | $31,550 | - | - |
$14,276
-
MMBtu
|
- | |
06 | 3.4115: Recover and reuse cooling water | $52,650 | $50,000 | - | - | - |
$52,650
-
Tgal
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,560 | $28,388 |
$14,215
268,200
kWh
|
$1,345
-
kW-mo/yr
|
- | - | |
08 | 2.1392: Replace purchased steam with other energy source | $3,578 | $13,772 | - | - |
$3,578
-
MMBtu
|
- | |
09 | 2.1392: Replace purchased steam with other energy source | $28,000 | $61,800 | - | - |
$28,000
-
MMBtu
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,764 | $2,451 |
$4,353
82,135
kWh
|
$411
-
kW-mo/yr
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,347 | $16,607 |
$13,110
247,358
kWh
|
$1,237
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $218,199 | $326,150 |
$105,073
1,982,493
kWh
|
$9,898
-
kW-mo/yr
|
$48,968
-
MMBtu
|
$54,260
-
Tgal
|
||
TOTAL IMPLEMENTED | $88,931 | $112,379 |
$13,110
247,358
kWh
|
$1,237
-
kW-mo/yr
|
$20,324
-
MMBtu
|
$54,260
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs