*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 35,000
ft2
Annual Production 66,013
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,330 11,844,005
kWh
Electricity Demand $54,339 29,482
kW-mo/yr
Electricity Fees $1,494 -
Natural Gas $272,495 39,391
MMBtu
Waste Disposal Costs
Water Usage $903,245 140,210
Tgal
TOTAL YEARLY COSTS $1,860,903
RECOMMENDED SAVINGS* $218,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 3.7221: Improve process control to prevent spills of material $4,080 $450 - - $2,470
-
MMBtu
$1,610
-
Tgal
02 2.2136: Install / repair insulation on steam lines $644 $233 - - $644
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $17,800 $600 $16,261
306,800
kWh
$1,539
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $62,500 $120,300 $57,134
1,078,000
kWh
$5,366
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $14,276 $31,550 - - $14,276
-
MMBtu
-
06 3.4115: Recover and reuse cooling water $52,650 $50,000 - - - $52,650
-
Tgal
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,560 $28,388 $14,215
268,200
kWh
$1,345
-
kW-mo/yr
- -
08 2.1392: Replace purchased steam with other energy source $3,578 $13,772 - - $3,578
-
MMBtu
-
09 2.1392: Replace purchased steam with other energy source $28,000 $61,800 - - $28,000
-
MMBtu
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,764 $2,451 $4,353
82,135
kWh
$411
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $14,347 $16,607 $13,110
247,358
kWh
$1,237
-
kW-mo/yr
- -
TOTAL RECOMMENDED $218,199 $326,150 $105,073
1,982,493
kWh
$9,898
-
kW-mo/yr
$48,968
-
MMBtu
$54,260
-
Tgal
TOTAL IMPLEMENTED $88,931 $112,379 $13,110
247,358
kWh
$1,237
-
kW-mo/yr
$20,324
-
MMBtu
$54,260
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs