Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,750

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0653 #08 Y:2026 Install adequate dryers on air lines to eliminate blowdown $3,000 $3,443
UF0653 #07 Y:2026 Re-arrange equipment layout to reduce labor costs $5,627 $1,368
UF0653 #06 Y:2026 Install automatic part storage / retreval system $8,160 $40,000
UF0653 #05 Y:2026 Replace existing equipment with more suitable substitutes $110,880 $740
UF0653 #04 Y:2026 Lower light fixtures in high ceiling areas $2,349 $4,268
UF0653 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,347 $28,316
UF0653 #02 Y:2026 Use demand controller or load shedder $9,772 $6,163
UF0653 #01 Y:2026 Use solar heat to make electricty $109,343 $322,608
OK1178 #05 Y:2026 Clean and maintain refrigerant condensers and towers $5,237 $4,365
OK1178 #04 Y:2026 Install occupancy sensors $11,237 $3,916
OK1178 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,495 $42,458
OK1178 #02 Y:2026 Optimize plant power factor $1,207 $2,699
OK1178 #01 Y:2026 Use solar heat to make electricty $19,887 $289,920
UF0650 #09 Y:2026 Replace existing equipment with more suitable substitutes $25,000 $3,560
UF0650 #08 Y:2026 Improve space comfort conditioning $56,488 $22,740
UF0650 #07 Y:2026 Analyze flue gas for proper air/fuel ratio $5,076 -
UF0650 #06 Y:2026 Minimize condenser cooling water temperature $11,638 $28,395
UF0650 #05 Y:2026 Substitute compressed air cooling with water or air cooling $12,689 $2,700
UF0650 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $23,113 -