| Assessment Year | 2026 |
|---|---|
| Principal Product | Mobile Clean Rooms |
| NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
| SIC | 3826: Laboratory Analytical Instruments |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
175,000
ft2
|
| Annual Production | 1,300
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,092 | 1,145,520 |
kWh
|
$0.061 |
| Electricity Demand | $69,709 | 4,662 |
kW-mo/yr
|
$14.95 |
| Electricity Fees | $24,261 | - |
|
- |
| TOTAL YEARLY COSTS | $164,062 | |||
| RECOMMENDED SAVINGS* | $259,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $109,343 | $322,608 |
$37,569
615,883
kWh
|
$71,774
-
kW-mo/yr
|
- | - | |
| 02 | 2.3191: Use demand controller or load shedder | $9,772 | $6,163 |
$4,891
80,186
kWh
|
$4,881
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,347 | $28,316 |
$5,624
92,190
kWh
|
$4,723
-
kW-mo/yr
|
- | - | |
| 04 | 2.7141: Lower light fixtures in high ceiling areas | $2,349 | $4,268 |
$2,349
38,500
kWh
|
- | - | - | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $110,880 | $740 | - | - | $110,880 | - | |
| 06 | 4.448: Install automatic part storage / retreval system | $8,160 | $40,000 | - | - | - | $8,160 | |
| 07 | 4.513: Re-arrange equipment layout to reduce labor costs | $5,627 | $1,368 | - | - | - | $5,627 | |
| 08 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $3,000 | $3,443 | - | - | - | $3,000 | |
| TOTAL RECOMMENDED | $259,478 | $406,906 |
$50,433
826,759
kWh
|
$81,378
-
kW-mo/yr
|
$110,880 | $16,787 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs