ITAC Assessment: UF0653
ITAC logo
ITAC Assessment: UF0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Mobile Clean Rooms
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 175,000
ft2
Annual Production 1,300
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,092 1,145,520
kWh
Electricity Demand $69,709 4,662
kW-mo/yr
Electricity Fees $24,261 -
TOTAL YEARLY COSTS $164,062
RECOMMENDED SAVINGS* $259,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $109,343 $322,608 $37,569
615,883
kWh
$71,774
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $9,772 $6,163 $4,891
80,186
kWh
$4,881
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,347 $28,316 $5,624
92,190
kWh
$4,723
-
kW-mo/yr
- -
04 2.7141: Lower light fixtures in high ceiling areas $2,349 $4,268 $2,349
38,500
kWh
- - -
05 4.652: Replace existing equipment with more suitable substitutes $110,880 $740 - - $110,880 -
06 4.448: Install automatic part storage / retreval system $8,160 $40,000 - - - $8,160
07 4.513: Re-arrange equipment layout to reduce labor costs $5,627 $1,368 - - - $5,627
08 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,000 $3,443 - - - $3,000
TOTAL RECOMMENDED $259,478 $406,906 $50,433
826,759
kWh
$81,378
-
kW-mo/yr
$110,880 $16,787
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs