ITAC Assessment: IA0408
ITAC logo
ITAC Assessment: IA0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aviation Electronics
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 268
Plant Area 46,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,345 2,041,000
kWh
Electricity Demand $18,473 489
kW-mo/yr
Natural Gas $3,111 339
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,366 $16,698 $8,235
192,815
kWh
$1,131
-
kW-mo/yr
02 2.7135: Install occupancy sensors $3,284 $1,309 $3,284
76,902
kWh
-
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $215 $25 $187
4,374
kWh
$28
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $491 $700 $430
10,071
kWh
$61
-
kW-mo/yr
TOTAL RECOMMENDED $13,356 $18,732 $12,136
284,162
kWh
$1,220
-
kW-mo/yr
TOTAL IMPLEMENTED $9,366 $16,698 $8,235
192,815
kWh
$1,131
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs