Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,687

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1151 #05 Y:2026 Use solar heat to make electricty $129,213 $1,350,000
UD1151 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,023 $27,000
UD1151 #03 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,394 $17,000
UD1151 #02 Y:2026 Reduce ventilation air $12,198 $22,000
UD1151 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,394 $12,000
MI0478 #04 Y:2026 Use demand controller or load shedder $4,519 $18,392
MI0478 #03 Y:2026 Turn off equipment when not in use $14,074 $2,600
MI0478 #02 Y:2026 Lower temperature during the winter season and vice-versa $27,548 $480
MI0478 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $4,889 -
UU0312 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $30,000 $139,500
UU0312 #04 Y:2026 Level zero – install control systems for existing equipment $157,000 $650,000
UU0312 #03 Y:2026 Re-use or recycle hot or cold process exhaust air $12,500 $41,270
UU0312 #02 Y:2026 Insulate bare equipment $11,840 $7,940
UU0312 #01 Y:2026 Modify process to reduce material use/cost $7,200 $4,635
UU0311 #06 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $11,150 $93,000
UU0311 #05 Y:2026 Insulate bare equipment $1,230 $2,350
UU0311 #04 Y:2026 Reduce or eliminate waste $3,600 $4,640
UU0311 #03 Y:2026 Use waste heat from hot flue gases to preheat $13,900 $41,300
UU0311 #02 Y:2026 Use / purchase optimum sized compressor $9,400 $40,200
UU0311 #01 Y:2026 Install system to collect scrap $279,000 $750,000