Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,808

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0701 #07 Y:2026 Use waste heat from hot flue gases to preheat $1,956 $1,671
SD0701 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $8,018 $2,153
SD0701 #05 Y:2026 Use most efficient type of electric motors $3,266 $34,026
SD0701 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $918 $8,600
SD0701 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $84 $424
SD0701 #02 Y:2026 Use battery storage for demand control $1,255,541 $298,093
SD0701 #01 Y:2026 Use solar heat to make electricty $605,975 $1,453,756
MZ1024 #07 Y:2026 Use solar heat to make electricty $24,308 $160,875
MZ1024 #06 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $4,015 $750
MZ1024 #05 Y:2026 Air condition only space necessary $13,313 $30,376
MZ1024 #04 Y:2026 Chill water to the highest temperature possible $11,036 $12,400
MZ1024 #03 Y:2026 Replace existing chiller with high efficiency model $16,712 $80,000
MZ1024 #02 Y:2026 Install occupancy sensors $3,027 $830
MZ1024 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,863 $8,362
IP0223 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,719 $9,213
IP0223 #05 Y:2026 Use waste heat from hot flue gases to preheat $19,126 $49,500
IP0223 #04 Y:2026 Optimize plant power factor $32,045 $48,160
IP0223 #03 Y:2026 Install compressor air intakes in coolest locations $22,280 $2,784
IP0223 #02 Y:2026 Reduce space conditioning during non-working hours $2,359 -
IP0223 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $18,392 -