Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169,096

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0473 #06 Y:2026 Insulate bare equipment $275 $133
MS0473 #05 Y:2026 Install occupancy sensors $1,879 $1,296
MS0473 #04 Y:2026 Use properly designed and sized hvac equipment $229 $450
MS0473 #03 Y:2026 Reduce heat gain by window tinting $1,417 $5,292
MS0473 #02 Y:2026 Use computer programs to optimize hvac performance $4,835 $466
MS0473 #01 Y:2026 Keep equipment clean $2,579 $200
LE0616 #06 Y:2026 Install compressor air intakes in coolest locations $1,024 $4,000
LE0616 #05 Y:2026 Use solar heat to heat water $42,290 $125,212
LE0616 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,850 $4,000
LE0616 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,401 $2,000
LE0616 #02 Y:2026 Install timers and/or thermostats $603 -
LE0616 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $3,281 -
MS0472 #06 Y:2026 Turn off equipment when not in use $9,021 -
MS0472 #05 Y:2026 Install occupancy sensors $277 $1,946
MS0472 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $4,205 -
MS0472 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $174 -
MS0472 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,104 $4,093
MS0472 #01 Y:2026 Moderate cooling tower outlet temperature $1,553 $248
LE0614 #05 Y:2026 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $239,344 $340,548
LE0614 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $994 $2,381