ITAC Assessment: LE0616
ITAC logo
ITAC Assessment: LE0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Precision Machine Parts
NAICS 332710: Machine Shops
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 7,500
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,925 361,178
kWh
Electricity Demand $47,985 984
kW-mo/yr
Electricity Fees $5,212 -
Natural Gas $4,778 240
MMBtu
TOTAL YEARLY COSTS $100,900
RECOMMENDED SAVINGS* $51,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,281 - $2,110
17,734
kWh
$1,171
-
kW-mo/yr
02 2.7261: Install timers and/or thermostats $603 - $603
5,070
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,401 $2,000 - $2,401
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,850 $4,000 $1,167
9,803
kWh
$683
-
kW-mo/yr
05 2.9112: Use solar heat to heat water $42,290 $125,212 $10,674
89,700
kWh
$31,616
-
kW-mo/yr
06 2.4221: Install compressor air intakes in coolest locations $1,024 $4,000 $674
5,212
kWh
$349
-
kW-mo/yr
TOTAL RECOMMENDED $51,449 $135,212 $15,228
127,519
kWh
$36,220
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs