| Assessment Year | 2026 |
|---|---|
| Principal Product | Processed/Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 9 |
| Plant Area |
520,000
ft2
|
| Annual Production | 223,000
Tgal
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $119,788 | 1,394,669 |
kWh
|
$0.086 | |
| Electricity Demand | $11,165 | 2,527 |
kW-mo/yr
|
$4.42 | |
| Electricity Fees | $17,707 | - |
|
- | |
| Natural Gas | $1,508 | 31 |
MMBtu
|
$48.65 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,207 | 6,535 |
Tgal
|
$1.26 | |
| TOTAL YEARLY COSTS | $158,375 | ||||
| RECOMMENDED SAVINGS* | $283,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $28,174 | - |
$1,585
18,433
kWh
|
- |
$26,589
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,956 | $1,640 |
$12,103
140,745
kWh
|
$853
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,413 | $3,600 |
$2,254
26,208
kWh
|
$159
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $994 | $3,375 |
$817
9,504
kWh
|
$177
-
kW-mo/yr
|
- | |
| 05 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $239,344 | $340,548 |
$152,513
1,773,408
kWh
|
$86,831
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $283,881 | $349,163 |
$169,272
1,968,298
kWh
|
$88,020
-
kW-mo/yr
|
$26,589
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs