ITAC Assessment: LE0614
ITAC logo
ITAC Assessment: LE0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed/Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 520,000
ft2
Annual Production 223,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,788 1,394,669
kWh
Electricity Demand $11,165 2,527
kW-mo/yr
Electricity Fees $17,707 -
Natural Gas $1,508 31
MMBtu
Waste Disposal Costs
Water Usage $8,207 6,535
Tgal
TOTAL YEARLY COSTS $158,375
RECOMMENDED SAVINGS* $283,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $28,174 - $1,585
18,433
kWh
- $26,589
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,956 $1,640 $12,103
140,745
kWh
$853
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,413 $3,600 $2,254
26,208
kWh
$159
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $994 $3,375 $817
9,504
kWh
$177
-
kW-mo/yr
-
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $239,344 $340,548 $152,513
1,773,408
kWh
$86,831
-
kW-mo/yr
-
TOTAL RECOMMENDED $283,881 $349,163 $169,272
1,968,298
kWh
$88,020
-
kW-mo/yr
$26,589
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs