ITAC Assessment: OK0832
ITAC logo
ITAC Assessment: OK0832
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aircraft engine parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 42,163
ft2
Annual Production 380,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,351 2,158,718
kWh
Natural Gas $4,232 367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $2,902 $7,700 $2,902
39,754
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $955 $1,288 $955
13,078
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $995 $6,375 $995
13,632
kWh
- -
04 2.7135: Install occupancy sensors $655 $4,180 $655
8,970
kWh
- -
05 2.7241: Install outside air damper / economizer on hvac unit $18,428 $7,200 $18,428
252,432
kWh
- -
06 2.7232: Replace existing hvac unit with high efficiency model $7,382 $34,962 $7,382
101,123
kWh
- -
07 2.2691: Shut off cooling if cold outside air will cool process $6,074 $29,738 $6,074
83,211
kWh
- -
08 2.6232: Install set-back timers $2,158 $185 $1,926
26,382
kWh
$232
-
MMBtu
-
09 2.7211: Clean and maintain refrigerant condensers and towers $2,579 $1,170 $2,579
35,323
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,669 $696 $1,669
22,861
kWh
- -
11 2.3212: Optimize plant power factor $1,632 $8,864 - - $1,632
TOTAL RECOMMENDED $45,429 $102,358 $43,565
596,766
kWh
$232
-
MMBtu
$1,632
TOTAL IMPLEMENTED $2,579 $1,170 $2,579
35,323
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs