Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,938

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0614 #05 Y:2026 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $239,344 $340,548
LE0614 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $994 $3,375
LE0614 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,413 $3,600
LE0614 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $12,956 $1,640
LE0614 #01 Y:2026 Install timers and/or thermostats $28,174 -
MS0471 #05 Y:2026 Apply for tax-free status for energy purchases $31,195 -
MS0471 #04 Y:2026 Air condition only space necessary $1,695 $5,231
MS0471 #03 Y:2026 Use solar heat to make electricty $368,607 $4,228,200
MS0471 #02 Y:2026 Eliminate or reduce compressed air usage $182 -
MS0471 #01 Y:2026 Install occupancy sensors $22,607 $12,329
UD1139 #06 Y:2026 Optimize plant power factor $7,031 $18,291
UD1139 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,899 $20,626
UD1139 #04 Y:2026 Re-use or recycle hot or cold process exhaust air $38,983 $15,000
UD1139 #03 Y:2026 Install compressor air intakes in coolest locations $3,681 $4,800
UD1139 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $4,391 -
UD1139 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,028 $1,000
UW2606 #05 Y:2026 Use battery storage for demand control $20,950 $12,248
UW2606 #04 Y:2026 Install vinyl strip / high speed / air curtain doors $3,667 $22,869
UW2606 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $742 $5,000
UW2606 #02 Y:2026 Use proper thickness of insulation on building envelope $2,869 $7,446