ITAC Assessment: LE0612
ITAC logo
ITAC Assessment: LE0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Bottled water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 224
Plant Area 697,000
ft2
Annual Production 159,158,845
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,968,666 80,578,800
kWh
Electricity Demand $1,633,105 142,494
kW-mo/yr
Electricity Fees $1,184,918 -
Natural Gas $284,289 34,178
MMBtu
Waste Disposal Costs
Water Usage $627,471 201,977
Tgal
Water Disposal $373,449 410
Tgal
TOTAL YEARLY COSTS $7,071,898
RECOMMENDED SAVINGS* $930,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,987 - $13,326
360,169
kWh
$5,661
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $106,148 $20,000 - $106,148
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $65,985 $54,000 $45,374
1,226,330
kWh
$20,611
-
kW-mo/yr
- -
04 2.2622: Replace existing chiller with high efficiency model $355,566 $250,000 $(-400.0)
(-10,800)
kWh
$(-182.0)
-
kW-mo/yr
- $356,148
05 2.3191: Use demand controller or load shedder $138,433 $318,698 $89,442
2,417,364
kWh
$48,991
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $53,150 $155,751 $36,350
982,456
kWh
$16,800
-
kW-mo/yr
- -
07 2.9112: Use solar heat to heat water $192,683 $758,541 $57,100
1,543,293
kWh
$99,014
-
kW-mo/yr
$36,569 -
TOTAL RECOMMENDED $930,952 $1,556,990 $241,192
6,518,812
kWh
$297,043
-
kW-mo/yr
$36,569 $356,148
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs