ITAC Assessment: GT0539
ITAC logo
ITAC Assessment: GT0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Propane Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 39,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,211 2,285,463
kWh
Natural Gas $35,978 5,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $410 $2,445 $410
8,792
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,360 $400 $2,360
50,703
kWh
-
03 2.4133: Use most efficient type of electric motors $1,060 $5,550 $1,060
22,567
kWh
-
04 2.2522: Isolate hot or cold equipment $21,350 $34,500 - $21,350
-
MMBtu
TOTAL RECOMMENDED $25,180 $42,895 $3,830
82,062
kWh
$21,350
-
MMBtu
TOTAL IMPLEMENTED $3,830 $8,395 $3,830
82,062
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs