Assessment Year | 1994 |
---|---|
Principal Product | Propane Tanks |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 99 |
Plant Area |
39,000
ft2
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,211 | 2,285,463 |
kWh
|
$0.046 |
Natural Gas | $35,978 | 5,747 |
MMBtu
|
$6.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $410 | $2,445 |
$410
8,792
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,360 | $400 |
$2,360
50,703
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $1,060 | $5,550 |
$1,060
22,567
kWh
|
- | |
04 | 2.2522: Isolate hot or cold equipment | $21,350 | $34,500 | - |
$21,350
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,180 | $42,895 |
$3,830
82,062
kWh
|
$21,350
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,830 | $8,395 |
$3,830
82,062
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs