168,775
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0614 #05 Y:2026 | 05 | 2026 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $239,344 | $340,548 |
n/a
|
| LE0614 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $994 | $3,375 |
n/a
|
| LE0614 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $2,413 | $3,600 |
n/a
|
| LE0614 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,956 | $1,640 |
n/a
|
| LE0614 #01 Y:2026 | 01 | 2026 | Install timers and/or thermostats | $28,174 | - |
n/a
|
| LS0626 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,518 | $2,295 |
n/a
|
| LS0626 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $1,624 | $875 |
n/a
|
| LS0626 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $10,589 | $500 |
n/a
|
| LS0626 #01 Y:2026 | 01 | 2026 | Reduce space conditioning during non-working hours | $15,456 | $175 |
n/a
|
| LS0526 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $12,419 | $48,296 |
n/a
|
| LS0526 #05 Y:2026 | 05 | 2026 | Replace existing chiller with high efficiency model | $31,399 | $70,000 |
n/a
|
| LS0526 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $5,871 | $2,880 |
n/a
|
| LS0526 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $3,643 | $1,500 |
n/a
|
| LS0526 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $27,684 | $500 |
n/a
|
| LS0526 #01 Y:2026 | 01 | 2026 | Reduce space conditioning during non-working hours | $40,408 | $175 |
n/a
|
| NT0059 #08 Y:2026 | 08 | 2026 | Lower temperature during the winter season and vice-versa | $4,998 | - |
n/a
|
| NT0059 #07 Y:2026 | 07 | 2026 | Optimize plant power factor | $10,008 | $29,441 |
n/a
|
| NT0059 #06 Y:2026 | 06 | 2026 | Prevent excessive solvent usage (operator training) | $15,300 | $900 |
n/a
|
| NT0059 #05 Y:2026 | 05 | 2026 | Replace existing hvac unit with high efficiency model | $216,471 | $827,008 |
n/a
|
| NT0059 #04 Y:2026 | 04 | 2026 | Install equipment (eg compactor) to reduce disposal costs | $36,000 | $66,400 |
n/a
|