Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Testing laboratories
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM06 #11 Y:2022 Install vinyl strip / high speed / air curtain doors $10,435 $11,466
MUCM06 #10 Y:2022 Install vinyl strip / high speed / air curtain doors $537 $2,500
MUCM06 #09 Y:2022 Reduce space conditioning during non-working hours $20,603 $58,440
MUCM06 #08 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,882 $7,450
MUCM06 #07 Y:2022 Operate boilers on high fire setting $1,703 $450
MUCM06 #06 Y:2022 Turn off equipment when not in use $281 -
MUCM06 #05 Y:2022 Conserve energy by efficient use of vending machines $981 $900
MUCM06 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,458 $12,451
MUCM06 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $343 $934
MUCM06 #02 Y:2022 Reduce illumination to minimum necessary levels $8,378 -
MUCM06 #01 Y:2022 Insulate bare equipment $419 $742
MS0398 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $6,341 $3,593
MS0398 #02 Y:2022 Close holes and openings in building such as broken windows $8,148 $536
MS0398 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $5,227 $6,769
MS0395 #04 Y:2022 Upgrade obsolete equipment $2,447 $15,480
MS0395 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $677 $540
MS0395 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $10,723 $18,748
MS0395 #01 Y:2022 Replace existing chiller with high efficiency model $6,342 $210,000
WM0104 #07 Y:2017 Reduce illumination to minimum necessary levels $2,589 $554
WM0104 #06 Y:2017 Use synthetic lubricant $7,607 $650