ITAC Assessment: CI0067
ITAC logo
ITAC Assessment: CI0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Biotech Research and Development
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 3,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,348 725,580
kWh
Electricity Demand $39,497 2,485
kW-mo/yr
Electricity Fees $21,238 -
TOTAL YEARLY COSTS $192,083
RECOMMENDED SAVINGS* $158,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3141: Use battery storage for demand control $86,252 $793,800 $70,608
390,100
kWh
$15,644
-
kW-mo/yr
02 2.7262: Separate controls of air handlers from ac/ heating systems $28,476 $4,000 $28,476
157,325
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $18,338 $1,165 $8,930
49,339
kWh
$9,408
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,959 $4,100 $12,596
69,596
kWh
$1,363
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $9,850 $66,000 $9,850
54,423
kWh
-
06 2.7134: Use photocell controls $2,113 $1,725 $1,241
6,858
kWh
$872
-
kW-mo/yr
TOTAL RECOMMENDED $158,988 $870,790 $131,701
727,641
kWh
$27,287
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs