ITAC Assessment: UU0018
ITAC logo
ITAC Assessment: UU0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Medical Supplies
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 100,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,248 7,083,280
kWh
Electricity Demand $123,556 21,480
kW-mo/yr
Electricity Fees $40,389 -
Natural Gas $73,611 11,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,387 $127,085 $25,233
835,100
kWh
$14,154
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,498 $1,588 $1,071
35,450
kWh
$427
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,814 - $1,396
46,238
kWh
$418
-
kW-mo/yr
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,006 $1,000 - - $1,006
-
MMBtu
05 2.2437: Recover waste heat from equipment $4,721 $1,900 - - $4,721
-
MMBtu
TOTAL RECOMMENDED $48,426 $131,573 $27,700
916,788
kWh
$14,999
-
kW-mo/yr
$5,727
-
MMBtu
TOTAL IMPLEMENTED $45,114 $129,985 $25,233
835,100
kWh
$14,154
-
kW-mo/yr
$5,727
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs