ITAC Assessment: BS0112
ITAC logo
ITAC Assessment: BS0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 190
Plant Area 8,000,000
ft2
Annual Production 300,000
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,802,117 37,618,928
kWh
Electricity Demand $326,680 85,398
kW-mo/yr
TOTAL YEARLY COSTS $2,128,797
RECOMMENDED SAVINGS* $84,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,983 $1,500 $34,068
709,743
kWh
$4,915
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $13,971 $2,145 $12,204
255,816
kWh
$1,767
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $9,787 $13,000 $1,230
25,633
kWh
$8,557
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,785 $1,560 $1,785
37,219
kWh
-
05 2.6218: Turn off equipment when not in use $16,656 $1,031 $14,636
304,920
kWh
$2,020
-
kW-mo/yr
06 2.6231: Utilize controls to operate equipment only when needed $3,051 $2,790 $3,051
63,558
kWh
-
TOTAL RECOMMENDED $84,233 $22,026 $66,974
1,396,889
kWh
$17,259
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs