Assessment Year | 2007 |
---|---|
Principal Product | Rubber Bladders |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
80,000
ft2
|
Annual Production | 192,000
pieces
|
Production Hrs. Annual | 5,020
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,797 | 2,367,360 |
kWh
|
$0.074 |
Electricity Fees | $5,020 | - |
|
- |
Natural Gas | $294,848 | 57,720 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,771 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $331 | $600 | - |
$331
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $3,237 | $200 |
$3,237
5,001
kWh
|
- | |
03 | 2.213: Leaks and insulation | $9,860 | $1,491 | - |
$9,860
-
MMBtu
|
|
04 | 2.6231: Utilize controls to operate equipment only when needed | $31,671 | $79,800 |
$31,671
3,360
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $343 | $868 |
$343
3,086
kWh
|
- | |
06 | 2.492: | $648 | $1,275 |
$648
10,800
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $45,660 | $28,527 | - |
$45,660
-
MMBtu
|
|
08 | 2.492: | $2,490 | $1,019 |
$2,490
41,508
kWh
|
- | |
TOTAL RECOMMENDED | $94,240 | $113,780 |
$38,389
63,755
kWh
|
$55,851
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,771 | $3,159 |
$3,580
8,087
kWh
|
$10,191
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs