ITAC Assessment: TT0012
ITAC logo
ITAC Assessment: TT0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Rubber Bladders
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 80,000
ft2
Annual Production 192,000
pieces
Production Hrs. Annual 5,020
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,797 2,367,360
kWh
Electricity Fees $5,020 -
Natural Gas $294,848 57,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $331 $600 - $331
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $3,237 $200 $3,237
5,001
kWh
-
03 2.213: Leaks and insulation $9,860 $1,491 - $9,860
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $31,671 $79,800 $31,671
3,360
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $343 $868 $343
3,086
kWh
-
06 2.492: $648 $1,275 $648
10,800
kWh
-
07 2.2511: Insulate bare equipment $45,660 $28,527 - $45,660
-
MMBtu
08 2.492: $2,490 $1,019 $2,490
41,508
kWh
-
TOTAL RECOMMENDED $94,240 $113,780 $38,389
63,755
kWh
$55,851
-
MMBtu
TOTAL IMPLEMENTED $13,771 $3,159 $3,580
8,087
kWh
$10,191
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs