ITAC Assessment: OK1163
ITAC logo
ITAC Assessment: OK1163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Anti-microbial enzymes
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 22,500
ft2
Annual Production 17,537
lb
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,344 568,080
kWh
Natural Gas $1,916 254
MMBtu
Waste Disposal Costs
Water Usage $8,194 3,993
Tgal
Water Disposal $23,748 5,472
Tgal
TOTAL YEARLY COSTS $100,202
RECOMMENDED SAVINGS* $45,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9114: Use solar heat to make electricty $10,845 $62,586 $10,845
92,694
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,052 $12,414 $3,052
26,082
kWh
03 2.7135: Install occupancy sensors $884 $2,870 $884
7,557
kWh
04 2.7232: Replace existing hvac unit with high efficiency model $3,376 $5,665 $3,376
28,853
kWh
05 2.7211: Clean and maintain refrigerant condensers and towers $1,973 $3,370 $1,973
16,863
kWh
06 2.7226: Use computer programs to optimize hvac performance $25,417 $42,525 $25,417
217,237
kWh
07 2.4231: Reduce the pressure of compressed air to the minimum required $82 - $82
698
kWh
TOTAL RECOMMENDED $45,629 $129,430 $45,629
389,984
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs