ITAC Assessment: MZ1019
ITAC logo
ITAC Assessment: MZ1019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product food testing lab
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 26,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,421 425,600
kWh
Electricity Demand $5,947 1,544
kW-mo/yr
Natural Gas $6,781 640
MMBtu
TOTAL YEARLY COSTS $45,149
RECOMMENDED SAVINGS* $15,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $34 $255 $34
448
kWh
- - -
02 2.7135: Install occupancy sensors $66 $830 $66
888
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $81 $300 $66
874
kWh
$15
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $113 $205 $75
981
kWh
$5
-
kW-mo/yr
- $33
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $559 $4,050 $559
7,357
kWh
- - -
06 2.7311: Ventilation system to shut off when room is not in use $2,598 $1,600 $1,369
18,016
kWh
- $1,229
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $9,060 $87,750 $9,060
119,194
kWh
- - -
08 2.7232: Replace existing hvac unit with high efficiency model $3,459 $20,625 $3,235
42,560
kWh
$224
-
kW-mo/yr
- -
TOTAL RECOMMENDED $15,970 $115,615 $14,464
190,318
kWh
$244
-
kW-mo/yr
$1,229
-
MMBtu
$33
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs