Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Membership organizations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0607 #07 Y:2025 Pay bills on time to avoid late fees $23 $39
AS0607 #06 Y:2025 Install timers and/or thermostats $156 $264
AS0607 #05 Y:2025 Reduce heat gain by window tinting $161 $504
AS0607 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $401 $1,773
AS0607 #03 Y:2025 Begin a practice of predictive / preventative maintenance $2,440 $9,194
AS0607 #02 Y:2025 Clean or color roof to reduce solar load $2,482 $26,171
AS0607 #01 Y:2025 Use solar heat to make electricty $14,486 $140,485
AS0606 #07 Y:2025 Close holes and openings in building such as broken windows $148 $97
AS0606 #06 Y:2025 Reduce heat gain by window tinting $237 $301
AS0606 #05 Y:2025 Use or replace with energy efficient substitutes $279 $180
AS0606 #04 Y:2025 Shut off pilots in standby equipment $371 $100
AS0606 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,872 $3,925
AS0606 #02 Y:2025 Install timers on light switches in little used areas $1,929 $420
AS0606 #01 Y:2025 Use battery storage for demand control $3,172 $6,000
MUCM26 #06 Y:2024 Use solar heat to make electricty $379 $2,196
MUCM26 #05 Y:2024 Reschedule and rearrange multiple-source heating systems $171 -
MUCM26 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $547 $1,881
MUCM26 #03 Y:2024 Reduce illumination to minimum necessary levels $58 -
MUCM26 #02 Y:2024 Use optimum temperature $32 -
MUCM26 #01 Y:2024 Replace fossil fuel equipment with electrical equipment $2,717 -