Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Museums, art galleries, and botanical and zoological gardens
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1151 #06 Y:2025 Conserve energy by efficient use of vending machines $5,416 $6,080
OK1151 #05 Y:2025 Optimize plant power factor $2,887 $2,301
OK1151 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $14,043 $9,252
OK1151 #03 Y:2025 Clean and maintain refrigerant condensers and towers $9,579 $8,325
OK1151 #02 Y:2025 Use solar heat to make electricty $11,752 $133,380
OK1151 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,217 $21,255
UL2432 #07 Y:2024 Minimize condenser cooling water temperature $4,110 $9,700
UL2432 #06 Y:2024 Install outside air damper / economizer on hvac unit $6,002 $25,000
UL2432 #05 Y:2024 Use properly designed and sized hvac equipment $192,592 $100,000
UL2432 #04 Y:2024 Use solar heat to make electricty $9,036 $76,988
UL2432 #03 Y:2024 Install occupancy sensors $434 $1,518
UL2432 #02 Y:2024 Install occupancy sensors $949 $998
UL2432 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,321 $905
OK1129 #04 Y:2024 Replace existing hvac unit with high efficiency model $1,016 $5,830
OK1129 #03 Y:2024 Optimize plant power factor $306 $1,037
OK1129 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,639 $3,600
OK1129 #01 Y:2024 Use solar heat to make electricty $4,450 $25,650
IC0309 #07 Y:2024 Use demand controller or load shedder $266 $1,358
IC0309 #06 Y:2024 Close holes and openings in building such as broken windows $121 $73
IC0309 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $334 $356