ITAC Assessment: LS0003
ITAC logo
ITAC Assessment: LS0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Museum
NAICS 712110: Museums
SIC 8422: Arboreta and Botanical or Zoological Gardens
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 168,104
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,774 8,401,519
kWh
Electricity Demand $115,830 14,961
kW-mo/yr
Natural Gas $27,272 4,111
MMBtu
Waste Disposal Costs
Water Usage $102,731 20,134
Tgal
TOTAL YEARLY COSTS $781,607
RECOMMENDED SAVINGS* $36,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7273: Install desiccant humidity control system $17,595 - $15,094
235,840
kWh
$2,501
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $1,307 - $1,121
17,520
kWh
$186
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $1,869 - $1,869
29,200
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,982 - $1,700
26,561
kWh
$282
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $12,478 - $10,705
167,265
kWh
$1,773
-
kW-mo/yr
-
06 4.463: Modify facility to avoid excess maintenance costs $1,200 - - - $1,200
TOTAL RECOMMENDED $36,431 - $30,489
476,386
kWh
$4,742
-
kW-mo/yr
$1,200
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs