ITAC Assessment: IC0309
ITAC logo
ITAC Assessment: IC0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Museum and Office Space
NAICS 712110: Museums
SIC 8412: Museums and Art Galleries
Sales Range less than $500
k
# of Employees 10
Plant Area 43,560
ft2
Annual Production 1
units
Production Hrs. Annual 1,664
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,254 152,692
kWh
Waste Disposal Costs
Water Usage $2,153 474
Tgal
TOTAL YEARLY COSTS $19,407
RECOMMENDED SAVINGS* $1,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $631 - $631
5,599
kWh
02 2.7212: Install or upgrade insulation on hvac distribution systems $384 $1,537 $384
3,402
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $35 $70 $35
306
kWh
04 2.7135: Install occupancy sensors $49 $257 $49
432
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $334 $356 $334
2,962
kWh
06 2.7444: Close holes and openings in building such as broken windows $121 $73 $121
1,071
kWh
07 2.3191: Use demand controller or load shedder $266 $1,358 $266
2,358
kWh
TOTAL RECOMMENDED $1,819 $3,651 $1,819
16,131
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs